Hanging basket operation rules
writer:admin
click: 401
publish: 2019-08-29
1. Operators must be in good health and pass the professional training examination. They can operate independently only after obtaining the operation certificate issued by the relevant departments. Students must operate under the guidance of their master. _
2. After installation, the following inspection tests shall be carried out to ensure that they are normal before they can be put into use. _
1) Inspection of the installation of roof mechanism should be well coordinated and reliable anchorage; cantilever length and connection mode are correct;
2) No twisting, extrusion and loosening of wire rope; no excessive wear and breakage, correct suspension, winding and suspension weight;
_5) The static overload test and 110% dynamic overload test of the rated lifting weight of the hanging basket should be done, requiring normal lifting and reliable limit device. _
3. Before operation, the following examinations should be carried out:
_1) Roofing mechanism, suspension weight and wire rope meet the requirements; 2) Power supply voltage should be normal, grounding (zero) protection is good;
4) There is no sundries in the hanging basket, and overloading is strictly prohibited. _
4. After startup, the lifting basket operation test is carried out, and the normal operation is confirmed before it can be operated. _
5. In operation, when abnormal operation is found, the machine should be stopped immediately and safety measures should be taken. It shall not continue to be used until it has been inspected and repaired by professionals. _
6. When using hanging basket for welding operation, the hanging basket and wire rope must be fully protected, and should not be used as wiring circuit. _
7. After operation, the hanging basket should be cleaned, suspended 3 m from the ground, cut off the power supply and remove the ladder.